Sampling Notification / November 6, 2024
City of Newcastle Tank #1 Sampling Notification
Concerning the maintenance issue and the chlorinating of Tank #1, we have collected water samples from the sample sites that were positive after chlorinating the system. We follow AWWA standard C651 which requires collecting 2 sets of samples 16-24 hours apart. We collected samples on Monday and Tuesday and all samples that were collected are negative for all bacteria.
We also checked the level of chlorine still in the water and there is only a trace of chlorine left. The maximum chlorine residual EPA allows is 3ppm and the minimum chlorine residual is .2ppm. The following table shows the recorded Parts Per Million (ppm) recorded during the sample collection Monday November 4, 2024:
Region 8 EPA personnel were in Newcastle to help investigate the problem. We are waiting for their report and what required corrective actions we must do.
If anyone has any questions, please contact me at 307-746-2882. Leave me a message; if no one answers I will return your call.
Greg Stumpff
Public Works Supervisor
Landfill Remediation Project / November 21, 2024
Notice of Public Meeting / November 26, 2024
City of Newcastle Water & Sewer Projects Public Meeting
The CITY OF NEWCASTLE, WYOMING will conduct a public meeting at 6:00 P.M., local time, on November 26th, 2024, in the City Council chambers at 10 W Warwick St, Newcastle, Wyoming. The purpose of the meeting is to allow citizens to review and comment on the following projects listed below. Each project involves replacement of the existing infrastructure with new components, with minor adjustments and improvements to bring the system up to current standards. The existing system is aging and in poor condition.
At the meeting, the City of Newcastle will present the preliminary concept design of the proposed projects and will discuss the estimated cost of the improvements and the plan for funding the improvements. A preliminary plan of improvements, cost estimates, and the funding plan can also be reviewed at the Newcastle City Clerk’s office at 10 W Warwick, Newcastle, Wyoming. Contact Stacy Haggerty at 307-746-3535.
The City of Newcastle has identified two projects to request eligibility for funding. Based on current cost estimates, the City of Newcastle plans to borrow $ 1,000,000 from the Wyoming Clean & Drinking Water State Revolving Loan Fund administered by the Wyoming Office of State Lands and Investments. Increased user fees will repay the loan. The average rate increase is estimated to be $ 1.00/month per user to repay the loan. Loan terms will be 2.5% interest rate and 20 years.
Written comments are also welcome. Send written comments to Greg Stumpff (Newcastle Public Works Supervisor) at 10 W Warwick St, Newcastle, Wyoming by 11:00 A.M. on November 25th, 2024.
Para español, visite deq.wyoming.gov.
Publish Date: November 14th & November 21st, 2024
Categorical Exclusion Determination for the City of Newcastle Landfill #1 Remediation Project
Example Categorical Exclusion Determination:
CATEGORICAL EXCLUSION DETERMINATION
For the City of Newcastle project Landfill #1 Remediation,
Weston County, Wyoming
The Department of Environmental Quality/Water Quality Division (DEQ) has conducted a review of the proposed Landfill #1 Remediation project in accordance with EPA and State of Wyoming procedures for implementing the State Environmental Review Process. DEQ has determined that this project is eligible for a categorical exclusion. Accordingly, DEQ is exempting the project from further substantive environmental review requirements under the State Environmental Review Process. Neither an Environmental Assessment/Finding of No Significant Impact nor an Environmental Impact Statement/Record of Decision will be required for the proposed action. The following is a brief description of the situation and the proposed action and a brief statement of how the action meets the criteria for a categorical exclusion.
The overall project includes design and installation of various corrective measures to remediate the site: 1) A groundwater cut-off trench to intercept contaminated groundwater, including surface seepage, flowing out of the landfill. 2) An evaporation pond to dispose of the collected groundwater. 3) A passive landfill gas venting system. 4) A sewer connection to the City sewer system for short term emergency and bypass use for groundwater disposal. 5) Removal of surface soils downstream of the landfill that were contaminated by seepage and placement of those soils into the landfill.
WDEQ Landfill Remediation Program (LRP) and the City will be jointly funding the project. Project work funded under this loan is estimated to cost approximately $4,000,000. WDEQ will fund 75%, or $3,000,000, and the City will fund 25%, or $1,000,000. The city has applied for an SRF loan request for the City's $1,000,000 share. The loan interest is 1.5% for a term of 20 years. The rate increases for this project were incorporated into the recent rate analysis.
The City of Newcastle is aware of and accepts the fact that they will be responsible for any required mitigative actions associated with and including storm water runoff, erosion control, archeological/historic artifacts, and air quality concerns. These will be part of the standard State Revolving Funds Program contract conditions. There are no noteworthy environmental issues/impacts/mitigation issues.
DEQ is granting an exclusion because the project is intended to address environmental issues created by Landfill #1. Past Nature and Extents studies have shown the seeping water from Landfill #1 is contaminated. The corrective measures planned with this project will improve the area’s environment. This project will be completely constructed in previously disturbed ground, specifically ground disturbed by operations while landfill #1 was in operation. DEQ has determined that exempting the proposed project from further review under the State Environmental Review Process will not result in adverse impacts to the population or the area of Landfill #1 Remediation project, Newcastle, Weston County, Wyoming.
The documentation to support this decision will be on file in the DEQ Cheyenne Office and is available for public review upon request. Requests for information about the proposed decision may be directed to Stan Miller, SRF Project Engineer by email (Stanley.miller@wyo.gov) or phone (307) 777-6371). Written comments shall be addressed to Stan Miller, Department of Environmental Quality, 200 W. 17th St., Suite 200, Cheyenne, WY 82002 or via FAX (307) 635-1785., and be postmarked on or before 5:00 p.m. on (The Publication Date plus 30 calendar days) to be considered. Electronic comments may only be submitted through and accepted by the Wyoming DEQ comment portal provided at http://wq.wyomingdeq.commentinput.com/. Phone or email comments will not be accepted.